Implementation

We acknowledge project termination,
not when everything is installed,

but when the system is running smoothly.

After having engineered the concept, we accompany every implementation step by step. This includes:

  • Creating installation plans
  • Construction management, monitoring and coordinating the work on the construction site
  • Cost and deadline monitoring
  • Technical inspection, operational control
  • Checking technical safety and assured performance characteristics
  • Formulating refurbishment proposals for existing systems
  • Safety measures
  • Commissioning of systems
  • Collecting and evaluating measurement data